Razer Viper 8k Delay Analysis
Channel:
Subscribers:
176,000
Published on ● Video Link: https://www.youtube.com/watch?v=mwf_F2VboFQ
Let's see if a polling rate of 8000Hz has a measurable impact on mouse latency and smoothness.
► Support Battle(Non)Sense: https://www.patreon.com/battlenonsense
► Connect with me:
➜ FB: facebook.com/BattleNonSense
➜ twitter: twitter.com/BattleNonSense
0:00 Intro
0:10 Start
0:47 What is the Polling Rate?
1:26 Mouse Click Latency
4:34 Mouse Movement Latency
10:05 Smoothness
11:02 Conclusion
Razer Viper FW v1.01.00
#Razer #8000Hz #InputLag #Viper8k
Other Videos By Battle(non)sense
Tags:
input lag
system latency
button to pixel delay
polling rate
8000Hz
1000Hz
LDAT
Razer
Viper 8k
Other Statistics
Overwatch 2 Statistics For Battle(non)sense
Battle(non)sense presently has 2,508,331 views for Overwatch 2 across 20 videos, with approximately 3 hours of Overwatch 2 video on his channel. This makes up 6.77% of the content that Battle(non)sense has uploaded to YouTube.